Transformers
100 kVA – 250 MVA · Um up to 550 kV
- HV power, MV collector and inverter-duty
- Liquid-immersed and cast-resin dry-type
- Ecodesign Tier 2 losses
Grid equipment
The New Braila Free Zone FactoryStart Q2 2027 delivery
HV, MV and LV transformers, battery energy storage systems and high-voltage substations, with the technical data an engineer needs and one form to define the requirements of a project.
Highest voltage for equipment, Um
Transformer rated power
Indicative energy per 20-ft container
Substation voltage levels
Equipment families
Read the technical data for each family, then add it to the configurator. Everything you tick ends up on a single technical requirements sheet.
100 kVA – 250 MVA · Um up to 550 kV
Up to 1500 V DC · 1 / 2 / 4 h duration
110 / 220 / 400 / 500 kV · 1250 – 4000 A
HV / MV / LV · IEC 60076 series
Power, collector, distribution and special-duty transformers. Define the voltage ratio, duty and system requirements; the final design follows engineering review.
Buchholz relay · Pressure relief device · DGPT2 · Oil temperature indicator · Winding temperature indicator · PT100 sensors · Magnetic oil level gauge · Dehydrating breather · Online DGA monitor · Fibre-optic hot-spot sensors · Bushing CTs · Surge arresters · Neutral earthing resistor · Electrostatic shield · Anti-vibration pads · Wheels / skids · Oil containment
Routine tests (IEC 60076-1) · Type test: temperature rise · Type test: lightning impulse · Special: short-circuit withstand (IEC 60076-5) · Special: sound level (IEC 60076-10) · Special: SFRA · Special: partial discharge · Witnessed FAT · Third-party inspection
| Parameter | Range / configuration | Standard / basis |
|---|---|---|
| Rated power | 16 – 250 MVA | IEC 60076-1 |
| Highest voltage Um | 72.5 / 123 / 145 / 245 / 420 / 550 kV | IEC 60076-3 |
| Typical ratios | 110/20 · 110/33 · 220/110 · 400/110 · 500/220 kV; grid connection, step-up | Project-specific |
| Frequency | 50 / 60 Hz | IEC 60076-1 |
| Vector group | Dyn5 · Dyn11 · YNd11 · YNyn0+d · Dy11y11 | IEC 60076-1 |
| Short-circuit impedance uk | Per IEC or project-specific % | IEC 60076-5 |
| Tap changer | DETC ±2 × 2.5 % · OLTC e.g. ±9 × 1.78 %, vacuum or oil type | IEC 60214-1 |
| Cooling | ONAN · ONAF · OFAF · ODAF · KNAN; AN / AF for dry-type | IEC 60076-2 / -11 |
| Insulating medium | Mineral oil · natural ester · synthetic ester · cast resin | IEC 60296 · 62770 · 61099 · 60076-11 |
| Windings / core | Copper or aluminium; grain-oriented steel or amorphous core | IEC 60076-1 |
| Insulation levels | LI / AC according to Um; SI from 245 kV upwards | IEC 60076-3 |
| Temperature rise | 60 / 65 K liquid-immersed; class F / H dry-type | IEC 60076-2 / -11 |
| Losses & efficiency | Ecodesign Tier 2; loss classes; PEI for larger units | EU 548/2014, 2019/1783 · EN 50708 |
| Sound level | Standard or low-noise, LWA on request | IEC 60076-10 |
| Tank & terminations | Conservator or hermetically sealed; porcelain or composite bushings, plug-in, cable box, LV busbar or busduct flange | IEC 60137 · EN 50180 |
| Corrosion category | C3 – C5 | ISO 12944 |
Final ratings, losses, dimensions and guaranteed values are fixed in the approved project specification.
13 positions. Tick a position to add it to your configurator.
ESS / BESS · IEC 62933 series
Battery DC blocks, AC blocks with MV skid, and C&I cabinets. Specify power and usable energy at the point of interconnection, the duty cycle and the scope boundary.
FCR · aFRR · mFRR · Energy arbitrage · Peak shaving · PV / wind co-location · Capacity mechanism · Black start · Islanding / microgrid · Reactive power support · Synthetic inertia
Standards and reports that can be requested: IEC 62619 · IEC 62933-5-2 · IEC 63056 · UN 38.3 · UL 9540 · UL 9540A · UL 1973 · NFPA 855 · EU Battery Regulation 2023/1542.
| Parameter | Range / configuration | Standard / basis |
|---|---|---|
| Container | 20-ft HC, liquid-cooled, 5.0 MWh at 0.5C | Indicative configuration |
| Cell chemistry | LFP (lithium iron phosphate); NMC on request | IEC 62619 |
| DC voltage | Up to 1500 V DC | IEC 62933-2-1 |
| Duration | 1 h / 2 h / 4 h (1C / 0.5C / 0.25C) | Project duty |
| PCS | Central or string; grid-following or grid-forming; 2.5 – 5 MVA per skid | IEC 62477-1 |
| MV skid | 0.69 kV / 20 or 33 kV transformer + ring main unit | IEC 60076 · IEC 62271-200 |
| Round-trip efficiency | AC value at point of interconnection | Guaranteed value |
| Cycle life / warranty | ≥ 8000 cycles | Duty profile |
| Thermal management | Liquid cooling (containers); air or liquid (cabinets) | IEC 62933-5-2 |
| Operating range | −30 … +50 °C; altitude ≤ 5000 m | Site conditions |
| Ingress / corrosion | IP55 container; C4 standard, C5 optional | IEC 60529 · ISO 12944 |
| Fire safety | Smoke, heat and gas (H₂ / CO) detection; aerosol or water-based suppression; deflagration venting; fire-brigade interface | IEC 62933-5-2 · NFPA 855 |
| EMS / SCADA | Modbus TCP · IEC 60870-5-104 · IEC 61850 | IEC 62443 · NIS2 |
| Grid-code compliance | EU RfG 2016/631 · EN 50549-2 · VDE-AR-N 4110 / 4120 · national TSO / DSO requirements | Connection-specific |
| Certifications held | Evidence supplied per project | No certification claim |
Final ratings, losses, dimensions and guaranteed values are fixed in the approved project specification.
8 positions. Tick a position to add it to your configurator.
110 – 500 kV · IEC 61936-1 · EN 50522
AIS, GIS and hybrid substations for generation, storage and industrial connections: primary equipment, protection and control, civil works and system studies in one scope.
Power, auxiliary and earthing transformers · reactive compensation · Main 1 / Main 2 protection · process bus · PRP / HSR · revenue metering · power-quality monitoring · control building or e-house.
Studies: load flow · short-circuit · insulation coordination · earthing · protection coordination · grid-code compliance · EMF. FAT, SAT, protection testing and commissioning records.
| Parameter | Range / configuration | Standard / basis |
|---|---|---|
| Technology | Outdoor air-insulated switchgear | IEC 61936-1 |
| Insulation | Air; breaker medium SF₆ or SF₆-free | EU F-gas 2024/573 |
| Voltage levels | 110/20 · 110/33 · 220/110 · 220/33 · 400/110 · 400/220 · 500/220 kV | IEC 61936-1 |
| Busbar schemes | Single busbar · Sectionalised single busbar · Double busbar · Double busbar + transfer · Ring · Breaker-and-a-half · H-scheme · Line-transformer block · Loop-in loop-out | System design |
| Rated current | 1250 – 4000 A | IEC 62271-1 |
| Short-circuit rating | 25 / 31.5 / 40 / 50 / 63 kA for 1 s or 3 s | IEC 62271-1 |
| Circuit breakers | Live-tank, dead-tank or GIS | IEC 62271-100 |
| Disconnectors & earthing switches | Centre-break, pantograph, knee-type; motor-operated | IEC 62271-102 |
| Instrument transformers | Metering class 0.2S; protection class 5P20 | IEC 61869 |
| Surge arresters | Metal-oxide, polymer or porcelain housed | IEC 60099-4 |
| MV switchgear | LSC2B · IAC AFLR | IEC 62271-200 |
| Neutral & compensation | Solid, resistor or Petersen coil; capacitor bank, shunt reactor, STATCOM / SVG | System studies |
| Protection functions | 21 · 87L · 87T · 87B · 50BF · 50/51 · 50N/51N · 64REF · 25 · 79 · 27/59 · 81 · 90 | IEC 60255 |
| Control & automation | IEC 61850 station bus; optional process bus; PRP / HSR redundancy | IEC 61850 · IEC 62439-3 |
| Metering & power quality | Revenue metering 0.2S; class A analyser; disturbance recorder | IEC 61000-4-30 |
| Dispatch, telecom, time sync | IEC 60870-5-104 gateway; OPGW / fibre; GPS, PTP | IEEE 1588 |
| Auxiliary supplies | 110 / 220 V DC with redundant chargers; UPS; diesel generator | Project scope |
| Civil & site | Control building or e-house; earthing grid, lightning protection, oil containment, firewalls, fencing, CCTV, access control, fire detection, HVAC | EN 50522 · IEEE 80 · IEC 62305 |
| Insulation coordination | System-specific LI / SI / AC levels | IEC 60071 |
Final ratings, losses, dimensions and guaranteed values are fixed in the approved project specification.
1 position. Tick a position to add it to your configurator.
System integration
A single-line view of a grid-connected storage plant. Select an element to see the parameters that define it, then open it in the configurator.
HV / MV · YNd11 · OLTC
Product configurator
Five steps, one form for all three families. Only your contact details are mandatory; leave any technical field open and KÖBER engineering will propose it.
Project delivery
Your project data and technical requirements from the configurator.
Sizing, interfaces and the open items left for KÖBER to propose.
Defined scope, guaranteed values, schedule and terms.
Approved design, production and factory acceptance testing.
Transport and logistics to the agreed Incoterm.
Site acceptance tests and energisation.
Standards & compliance
The standards this page refers to, by family. Applicable editions, test evidence and national grid-code requirements are confirmed per project; this list is not a claim of certification.
Request log
Visible to KÖBER team members only. Each entry is a technical requirements sheet submitted from this page.
| Reference | Submitted | Company | Project | Scope |
|---|
Your next project